Showing posts with label Energy Island. Show all posts
Showing posts with label Energy Island. Show all posts

Sunday, 13 May 2012

How to resolve the Wind Turbine crisis on Ynys Môn

A resolution to the public outcry over wind turbines on Ynys Môn requires some clear strategic thinking coupled with political will.

Because of its flat landscape and the fact that Anglesey County Council has not updated its planning policies on wind energy for over a decade, Ynys Môn has over the past year been specifically targeted by wind farm developers — as testified by the extraordinary surge of planning applications for giant turbines.

Public outcry ensued and, despite having initially been caught with their pants down, Anglesey County Council did the right thing by speedily carrying out a public consultation on new wind energy supplementary planning guidelines (SPG) together with introducing a far more stringent planning 'checklist' for wind developers designed to reduce the number of speculative applications.

A leaked discussion document prepared by planning officers after the public consultation showed that planners were broadly opposed to introducing any blanket guidelines for wind turbines on Ynys Môn — including publicly supported minimum separation distances, maximum height restrictions, and the preservation of Anglesey's AONB together with a suitable buffer zone. The leaved document showed that in essence planning officers would prefer to be allowed to consider each turbine application on its individual merits. This is clearly unsatisfactory but we cannot really blame the officers as their role to merely interpret and be guided by national policy — in this case TAN 8 — and not to propose political fixes, which is the preserve of our elected Councillors.

TAN 8 is the Welsh Government's primary planning policy for wind energy, and establishes a number of geographically defined 'Strategic Search Areas' (SSAs) in which large-scale wind farms should be clustered. It also goes on to provide guidance on what local planning policies can and should be introduced by local authorities. As Ynys Môn falls outside any SSA areas, the most crucial part of TAN 8 to this discussion is as follows (emphasis mine):

"Most areas outside SSAs should remain free of large wind power schemes. Local planning authorities may wish to consider the cumulative impact of small schemes in areas outside of the SSAs and establish suitable criteria for separation distances from each other and from the perimeter of existing wind power schemes or the SSAs. In these areas, there is a balance to be struck between the desirability of renewable energy and landscape protection. Whilst that balance should not result in severe restriction on the development of wind power capacity, there is a case for avoiding a situation where wind turbines are spread across the whole of a county. As a result, the Assembly Government would support local planning authorities in introducing local policies in their development plans that restrict almost all wind energy developments, larger than 5MW, to within SSAs and urban/industrial brownfield sites. It is acceptable in such circumstances that planning permission for developments over 5MW outside SSAs and urban/industrial brownfield sites may be refused."

This essentially tells Councils that although they cannot introduce local policies which would "result in severe restriction on the development of wind power capacity" (which would, for example, rule out blanket height restrictions), they are able to introduce what would in effect become local mini-SSAs to restrict development to one area only ("there is a case for avoiding a situation where wind turbines are spread across the whole of a county"). The question therefore is: which part of Ynys Môn would be most suitable as a housing area for large-scale turbines whilst (a) providing minimum disruption to the Island's landscape and tourism industry; and (b) providing the largest possible public utility to Ynys Môn residents?

Existing wind turbines already visible from the Rhosgoch site
The answer is the 198-acre disused Shell site at Rhosgoch which was gifted to Island in the 1980s and is now administered by the Isle of Anglesey Charitable Trust. The area is fairly out of the way, close to the existing small-scale wind turbine farms in the north of the Island, and the contaminated land which has stopped any other development on the site would not be an issue for erecting wind turbines. Therefore, if a local planning policy was put in place which meant that all wind turbine applications above 15 metres tall were restricted to the Rhosgoch site, then all ground rents from these giant turbines could be captured — through the Isle of Anglesey Charitable Trust — for the public good and used to preserve the various public services, such as leisure centres, now being threatened by cuts. With just 198 acres available (not including the area several football pitches large that could be taken up by the proposed giant transformer farm on Rhosgoch to convert the wind energy coming off the Irish Sea wind from AC to DC) the administrators of the scheme would be able to auction parcels of land off in 25-year leases to developers thus even further maximising revenue.

The scheme could be set-up as a giant Social Enterprise, and even go a step further by allowing various community councils and other local groups first option to rent land, thus allowing them to erect turbines which would provide a regular income for their activities. The scheme would not affect micro-wind generation and farm diversification as smaller wind turbines of up to 15 metres tall would still be possible throughout Ynys Môn outside of the AONB.

Such a policy may be open to legal challenge by developers, but in reality such an outcome would be unlikely as any challenge would be costly and take years — during which time it is likely (bearing in mind the national public disquiet regarding wind turbines) that the current generous subsidy regime for wind energy will be ended. Developers would recognise that if they want to make money on Ynys Môn they would need to rent land on the Rhosgoch site. As per the report in this week's Holyhead & Anglesey Mail about developers 'threatening' planning committee members with appeal, it is clear that developers are keen to rush through their plans as soon as possible to escape whatever restrictions may eventually come via the revised SPG and due to any changes to national policy.

Having any giant turbines on Anglesey may be unpalatable to many residents, however the fact is that without the introduction of a scheme such as I've outlined above then there is no doubt that wind turbine will multiply throughout Ynys Môn and have a real effect on tourism on the Island (all available research shows that between 10-30 percent of holidaymakers will not return to rural areas whose landscapes have been ruined by wind turbines). However, to make such a scheme a reality requires political will and unity from Anglesey's councillors — something which would provide a perfect public showcase for their strategic thinking and care for the Island as the Commissioners prepare to start handing power back to them from October onwards. It would also make 'Energy Island' a far more intelligent concept as a share of money generated from energy schemes on the island would be directly captured for the wider public good.

Saturday, 31 March 2012

Wylfa: What next?

Regular commenter Mairede Thomas succinctly sums up Ynys Môn's current position and dilemmas:

"As far as Anglesey is concerned this is how it stacks up:- the Biomass plant site at Anglesey Aluminium, that has gained planning approval, may be able to source cheap waste wood and other imported biofuel but if the experience of DRAX the Uk’s biggest co-firing coal station is anything to go by the cost of buying in imported biofuel could be prohibitive. In mid February Drax decided not to build a £1.3billion pair of 290MW biomass plants reasoning that the Uk subsidy is not attractive enough. And the Banks are not playing ball either, so putting together the finance is not proving too easy. So big biomass projects like the one on the north of our island may not materialize.

Now the Wylfa B site is up for grabs but EDF and Centrica will want taxpayer support too. Who knows what the Russians will want, but do we want them?

There does not appear to be any type of new, sizeable and reliable power generation plant, that is also acceptable in terms of the C02 targets the Uk has burdened itself with, being brought forward for development by the international power companies, or indeed smaller developers, unless they are given assurances that they will get a huge public subsidy.

So do we ditch the CO2 targets and go for coal and gas? Or do we nationalise nuclear?

I would look seriously at both of these options otherwise we may not have enough reliable new power plant and infrastructure being built to keep the lights on. And unless we find some significant new gas reserves (shale?) we will be at the mercy of imported fuel prices to heat our homes and run our businesses.

I hope our politicians will do everything possible to ensure that the skills built up in Anglesey over many years in the nuclear industry are not lost to the island or dispersed abroad. The excellent facilities at Coleg Menai offer young people who study there the prospect of sustainable and rewarding careers, let’s hope they can fulfil their career ambitions on Anglesey."

In the meantime, French energy giant EDF has shown its hand early and declared that it is not interested in taking on Wylfa whilst back on Anglesey the Head of the council's Energy Island project has announced that she is leaving.

Thursday, 29 March 2012

++ Horizon partners pull out of Wylfa B ++

Instead of an expected announcement of what reactor type they planned to use at Wylfa B, Horizon's joint venture partners E.ON and RWE npower have this morning instead announced that they will NOT proceed with plans to build Wylfa B and will instead seek to sell Horizon as an ongoing concern to new investors. The press release from RWE describes the reason as follows:

  • The global economic crisis has meant that capital for major projects is at a premium and nuclear power projects are particularly large scale, with very long lead times and payback periods; 
  • The effect of the accelerated nuclear phase out in Germany, which has led to RWE adopting a number of measures, including divestments, a capital increase, efficiency enhancements and a leaner capital expenditure budget;
A combination of these strategic factors, together with the significant ongoing costs of running the Horizon joint venture, has led to a situation where capital investment plans have been reviewed.
Press releases here, here and here.

Rumours began to surface last July, following the Fukushima disaster and Kanzler Merkel's decision to close German nuclear plants, that E.ON and RWE npower would "struggle to convey to investors the billions of euros in investment that would be required for building new reactors in the U.K. at a time when cash flows and earnings are under increased pressure after Germany decided to exit all nuclear energy". More recently there had been further rumours that the two partners were looking for a third partner in order to spread risks. With hindsight it becomes clear why the reactor vendor announcement has been continually delayed for the past few months. 

The implications of this news is catastrophic for Ynys Môn as so many other developments are predicated on Wylfa B going ahead, the following being just two examples:

  • Land & Lakes holiday resort development on the majority of the Anglesey Aluminium site has a business plan based on providing housing for Wylfa B construction workers
  • Coleg Menai's Energy Centre built to train a new generation of nuclear workers


Will this be the end of Wylfa B? I don't believe so: the Department of Energy and Climate Change's own estimates show that of a total of around 75GW in UK generating capacity, 20GW will disappear by 2015 as various ageing nuclear and coal plants will need to be decommissioned over the next few years. And as they current peak demand is around 65GW and growing, that means that the UK could be facing energy blackouts within the next decade — as made clear by the adjacent graph from The Economist.

The reality is that the UK government needs Wylfa B more than Horizon needs to build it — which means that by hook or by crook Wylfa B will eventually have to be built.

The fact of the matter is that the decision to replace the UK's ageing nuclear reactors should have been made years ago, instead Labour spent its 13 years in power obsessing over renewable energy and introducing ever more stringent carbon targets, under Energy Secretary Ed Milliband, which have led to our countryside being covered with hundreds of useless windmills but with no replacement for lost baseload capacity. (Ironically, according to the RWE and E.On's press releases they plan to instead invest in more UK renewable projects, no doubt due to faster returns due to a crazy market deforming subsidies!) 

If you don't believe me that Labour didn't make the necessary decisions, then believe Unite regional secretary for Wales, Andy Richards, who told the Daily Post in January 2009:

"The origins of [Anglesey Aluminium's problems] pre-date the current economic crisis, which is why Unite has been calling for the Labour Government to make the important decisions on energy supply for years. The procrastination over Wylfa means we are now looking at a probable closure, which would be catastrophic for Anglesey and Wales."

It wasn't until the Coalition government came into power two years ago that plans to replace our ageing nuclear fleet were finally put in place. The delay by the previous Labour government has meant that the UK now needs to make the necessary immensely costly infrastructure investments both post-Fukushima and during Europe's lowest economic ebb since WW2. Which puts the recent furore about Pastys into perspective.

Wednesday, 7 March 2012

Our seasons to come?

Between 1988 and 1989 the renowned Anglesey artist Keith Andrew RCA painted the well known and well loved 'Four Seasons' series of paintings: each one depicting the same traditional Penmynydd cottage, and its inhabitants, in Spring, Summer, Autumn and Winter. The paintings were an instant hit on Ynys Môn and beyond, the prints selling in their hundreds and hundreds. Now, 20 years later, in order to warn of the threat to Anglesey's beautiful landscape from the recent influx of planning applications for giant industrial-sized wind turbines, Keith has repainted the 'Four Seasons' cottage and its inhabitants to show Anglesey's possible future landscape:

Is this how Ynys Môn will look and be known for in a few years time?
(c) Keith Andrew 2012

If you want to help stop this becoming a reality, please join the next general meeting of Anglesey Against Wind Turbines on 7pm on 13th March at Ysgol Llanfairpwll. 

Friday, 10 February 2012

Ynys Môn Council wind turbine consultation - last chance to take part TODAY

If you have strong feelings either way about wind turbines on Ynys Môn, you still have until 5pm today to take part in the consultation on the subject behing held by Anglesey County Council.

All details are here. You don't have to use the consultation form provided, you can respond by simply emailing your thoughts to: planningpolicy@gwynedd.gov.uk

Wednesday, 1 February 2012

Whither 'Energy Island' as 250 protest wind turbines (& other energy projects) outside Anglesey County Council

Over 250 Ynys Môn residents joined this afternoon's mass demonstration outside the Council offices to protest against the large number of planning applications which have been submitted on the Island for ‘monster’ wind turbines of up to 100 metres (330 ft) in height — the equivalent of almost four Marquis of Anglesey’s Columns stacked one on top of the other. The large turnout on a weekday furthermore proves that Ynys Môn residents are far more concerned about wind turbines than they are about Wylfa B.




The protesters sought to highlight Anglesey County Council’s lack of preparedness for dealing with these industrial-sized turbines and to encourage residents to participate in the council’s ongoing consultation on new planning guidelines for wind turbines. The demonstration was timed to coincide with the last meeting of the council’s Planning Committee before the end of the consultation on February 10th.

Peboc biomass protesters
Significantly, for the first time, members of all the major energy project protest groups on Anglesey joined forces. Wind Turbine protesters were joined by people from Bodffordd against the Anaerobic Digestion plant and also Llangefni residents protesting against the massive proposed Biomass plant at Peboc. This highlights the fact I have stressed before that Anglesey County Council has got itself into a real mess with its Energy Island strategy because the majority of energy projects actually coming to Ynys Môn:

  • are massively oversized — whether a 100m wind turbine or a 180,000 tonne biomass plant 
  • deliver no discernible green benefits considering the long distances the source materials need to travel (wood coming from Nova Scotia, Canada, in the case of the proposed Peboc plant; abattoir waste from Powys in the case of the Bodffordd AD plant)
  • ultimately provide relatively few low-skilled, manual jobs without a proper assessment of the overall net effect on jobs (wind turbines in particular will generate no jobs at all on Ynys Môn)
  • require the shipping into Anglesey of large amounts of unpleasant waste (the Peboc biomass plant alone estimates 78 daily deliveries of wood; 5 daily deliveries of tallow and vegetable oil, and 88 trips related to the shipping of pellets. Thats a helluva lot of HGVs everyday)
  • do not lead to Ynys Môn becoming a 'Centre of Excellence' in any of these technologies
  • potentially have a dubious effect on tourism and other businesses

A senior councillor candidly admitted to me today, "the council has been caught with its pants down with these turbines". I agree. Now, as today's joint protests prove, its time for a major rethink of both Anglesey's planning and Energy Island policies. Ynys Môn needs a coherent strategy which will both protect existing industries (such as tourism) whilst also leading to the Island becoming a Centre of Excellence for emerging renewables technologies (like the tidal schemes at the Skerries) — and not a dustbin for unwanted, over-large, under-employing and inappropriately sited energy projects.

UPDATE: Some remarkable photos of the protest have been posted by Glyn Davies, Ynys Môn's most celebrated landscape photographer. More on his blog here.

Photo: Glyn Davies

Tuesday, 31 January 2012

Anglesonians, to the barricades...!

Monster Turbines, coming soon
to random spots all over Ynys Môn?
Whatever your views on the effectiveness of wind turbines, I don't think anyone would argue that they shouldn't be appropriately sized and sensitively sited if we are to have them. 

Accordingly I would hope that most people would recognise that the directionless and ad-hoc manner in which Anglesey County Council is currently attempting to deal with applications for a number of wind turbines of up to 100m (330 ft) in height is not ideal. 

To make matters worse the planning guidance for on-shore wind turbines which the Council is currently consulting on is so wooly that it would allow any kind of turbine, of any height, virtually anywhere on the Island. 

For a county which markets itself as an 'Energy Island' and which is about to become an Energy Enterprise Zone, this lack of any coherent strategy simply isn't good enough. Accordingly, I urge everyone who is free, to join the protests planned for tomorrow (or today, depending when you read this!) in Llangefni with the aim ensuring that councillors and relevant officers get the message that they need to think deeper about how to deal with the large influx of planning applications for these monster turbines.

Date:         Wednesday, 1st February
Time:        11.30 - 13.00
Location:   Outside Anglesey County Council offices in Llangefni.

Everyone welcome.

Monday, 16 January 2012

Slaying the Golden Goose with a Rotor Blade.

How Kyffin Williams might have been forced to
paint Ynys Môn in two or three years time.
The Welsh Government is committed to delivering a three percent annual reduction in CO2 from 2011 onwards. Part of the way it hopes to achieve this is through promoting the development of renewable energy in Wales such that it will deliver 4TWh of electricity per annum from renewable energy to 2010 and 7TWh to 2020. (For comparison purposes, in 2010 UK’s total electricity generation stood at around 26TWh.)

In 2004 the Welsh Government identified that there was an installed renewables capacity of only around 380MW (equating to around 1TWh; for comparison purposes Wylfa A has a capacity of 900MW and Wylfa B will generate 3300MW) in Wales and therefore reviewed the various forms of renewable energy technology which would allow it to reach its 4TWh target:
"Offshore wind is an emerging technology and cannot compete commercially with onshore wind at present without grant support as demonstrated by Round 1 offshore windfarm projects. All substantial hydroelectric power in Wales has already been developed and there remains little scope for further development. Utilising Biomass to produce electricity at competitive prices remains a challenge and Wave and Tidal Technologies are still emerging technologies in the developmental phase and are a considerable distance from commercial applications. Photovoltaics are interesting at the small scale, but not currently commercially viable outside of building systems."
Accordingly it concluded (somewhat prematurely perhaps) that onshore wind was basically the only "commercial renewable energy technology" which would allow Wales to reach its targets. As onshore wind has very obvious land planning implications — they require large amounts of open land on which to site turbines, sub-stations, and pylons to provide a grid connection, in addition to visual impact issues of, in some instances, 140m tall wind turbines — the Welsh Government in 2005 rushed through Technical Advice Note 8 (TAN8) as the main planning instrument to enable the development of onshore wind farms in Wales.

The seven "Strategic Search Areas" defined in TAN8 to be 'sacrificed' to large-scale
wind farm development shown in red above.
The closest to Ynys Môn is Clocaenog Forest on the Conwy and Denbighshire border.

TAN 8 basically defines seven opaquely named "Strategic Search Areas" (SSAs) within rural sections of Wales which, subject to empirical evidence gathering and scrutiny before they were identified, the Welsh Government decided could be 'sacrificed' to the development of large scale (over 25MW) wind farms. Clustering large scale wind farms in geographically defined areas was supposed to minimise the visual and environmental impact and also provide for efficiency in connecting them to the national grid. Also, given that such areas would be changed out of all recognition, this strategy also helps the Welsh Government restrict and contain the public discontent that was sure to follow the plans to a few relatively sparsely populated areas. 

As you can see from the above map, there are no SSAs on Ynys Môn — the nearest one being in Clocaenog Forest on the Conwy and Denbighshire border. Ynys Môn was not identified as being suitable for large-scale wind farm development, no doubt due to it being encircled by the largest Area of Outstanding Natural Beauty (AONB) in Wales amongst other reasons.

TAN 8 clearly states that the Welsh Government wants to protect such landscapes. It states: 
"Large areas of Wales were excluded from consideration as SSAs by features that militate against larger wind power developments. In particular large wind power proposals within a National Park or designated Area of Outstanding Natural Beauty would be contrary to well established planning policy and thus SSAs have not been considered for these areas".  [Section 2.7]
Unfortunately however, TAN 8 does not rule out the development of wind farms outside of SSAs. Although it explicitly states that "most areas outside SSAs should remain free of large wind power schemes", it encourages Local Authorities to consider the development of wind farms up to 25MW on urban or brownfield sites in addition to "smaller community based wind farms schemes (generally less than 5 MW)". However, crucially for Ynys Môn Council, its says that each Local Authority must do so through:
"a set of local criteria that would determine the acceptability of such schemes and define in more detail what is meant by 'smaller' and 'community based'. Local planning authorities should give careful consideration to these issues and provide criteria that are appropriate to local circumstances." [Section 2.12]
By 'community based', the Welsh Government clearly means that smaller schemes should be managed both with the consent of and for the advantage of communities. Ynys Môn has not yet prepared any such local criteria, nor has it defined how it proposes to define the meanings of 'smaller' and 'community based'. 

Furthermore, according to TAN 8, Local Authorities should:
"consider the cumulative impact of small schemes ... and establish suitable criteria for separation distances from each other and from the perimeter of existing wind power schemes or the SSAs. In these areas, there is a balance to be struck between the desirability of renewable energy and landscape protection. Whilst that balance should not result in severe restriction on the development of wind power capacity, there is a case for avoiding a situation where wind turbines are spread across the whole of a county." [Section 2.13]
Ynys Môn Council is not considering the cumulative impact of the 50 plus applications for wind turbines which have been made on the Island as it says it plans to deal with them on an individual and ad-hoc basis; criteria for separation distances have not been established; and, as the below map of wind turbine locations clearly shows, they are already spreading across the whole of the county — a situation with TAN 8 explicitly warns Local Authorities to avoid.

Wind Turbine applications: spread across the whole of Ynys Môn, despite TAN 8
instructing Local Authorities to avoid this.
Furthermore, despite all these applications being dealt with individually,
are they not in effect turning Ynys Môn into a de-facto Wind Farm?

© OpenStreetMap contributors, CC-BY-SA

TAN 8 was introduced by the Welsh Government six years ago in 2005. Ynys Môn's 'Energy Island' strategy was officially launched two years ago in 2010. Yet Anglesey Council did not issue for consultation its Supplementary Planning Guidance (SPG) for onshore windfarms — i.e. a local policy on how to deal with wind turbines — until just last month. The document itself sets out in great detail the planning process for applicants, but crucially is entirely devoid of any strategic consideration of how to deal with wind turbines on Ynys Môn:

  • It does not address the issue of avoiding wind turbines spreading across the whole Island as TAN 8 says it should
  • It allows for wind turbines to be erected in the AONB — what therefore is the point of having an AONB?
  • It does not establish any criteria for separation distances from residential properties, again despite TAN 8 saying that it should
  • It considers cumulative impact only from a visual impact standpoint — rather than recognising the need to consider all applications in the round. The current situation means that Ynys Môn in its entirety is being turned into a large-scale wind farm by default, yet each application is being considered individually. This what TAN 8 meant when it stipulated that regard should be had to the potential cumulative effect of smaller proposals.
  • It contains no consideration of "smaller community based schemes" whatsoever. 

In contrast, the joint SPG on onshore wind issued by Conwy and Denbighshire councils (issued in 2006 - take note Ynys Môn planners!) is a model of clear and strategic thought:

  • It strategically sets out policies on how to deal with large (over 25MW), medium (5-25MW) and small wind farms (<5MW)
  • It strategically limits all large-scale wind farms to the TAN 8 SSA of the Clocaenog Wind Farm Zone. 
  • Medium wind farms can only be developed within the Clocaenog Wind Farm Zone or on urban or brownfield sites
  • Both large and medium size wind farms must be a minium of 500m from the nearest residential property
  • Small wind farms are defined as being either 'Community' schemes or 'Domestic' schemes. In the case of domestic schemes, only one turbine no more than 15m in height is allowed. Community schemes must be owned by a community group, be composed of no more than three turbines no more than 70m tall, and must be a minimum of 500m from the nearest residential property. 
  • No windturbines are allowed in an AONB.
  • The number of small developments will be limited and consideration given to the cumulative impact of them.

Quite frankly, Ynys Môn's draft SPG is so lacking in any strategic thought it would be better if they quietly binned it and adopted Conwy and Denbighshire's grown-up one instead. 

This is what  Jonathan Jones CBE, the head of Visit Wales had to say about wind turbines recently:
"There is a growing recognition of the grave threat that wind turbines represent for the natural environment of Wales — the basis of our tourist economy. All our research consistently shows that the main reason for coming to Wales on holiday is the beautiful, natural and unspoilt environment. If we kill that then we kill an industry." 
Unless Anglesey Council changes direction rapidly we are in danger of turning Ynys Môn into a large floating wind farm — one which will destroy a tourism industry which, even according to the council's own estimates, brings in £215 million of income to the Island every year. In light of figures like this, those who criticise the campaign group Anglesey Against Wind Turbines as being anti-jobs are extremely wide of mark.

There is still time to stop the worse happening. Please respond to the consultation on Anglesey's SPG for onshore windfarm before 10th February (click here). Furthermore, please join the Anglesey Against Wind Turbines protests outside the Council's Llangefni offices at 11.30am on the 1st February — the date of the next Planning Committee meeting. 

Friday, 30 December 2011

Squeezed: the connection between Ynys Môn farm incomes and wind turbines

This post is intended as a short addition to my last post, a critique Ynys Môn's Energy Island strategy. In it I mentioned that a squeeze in farm profitability was pushing farmers towards various farm diversification schemes, including — controversially — the erection of wind turbines. Figures just released by Aberystwyth University's annual Farm Business Wales Survey show just how steeply farm incomes (with the exception of dairy, of which there is relatively little on Ynys Môn) have dropped over the past 12 months:

"Upland cattle and sheep farms recorded a decrease in the value of outputs of almost 1 per cent between 2009-2010 and 2010-2011, while inputs rose by 7 per cent – resulting in an income decrease of 18 per cent. 
"The value of outputs on lowland cattle and sheep farms in the identical sample rose by 3 per cent, while inputs increased by just over 12 per cent, leading to a similar 18 per cent fall back."

After a difficult decade including the Foot and Mouth disaster and continued government dithering over tackling Bovine TB, and now with such a considerable reduction in farm profitability due to the rising outgoing costs of feed and fertiliser, there is little wonder that additional income from the currently massively over-generous Feed In Tarifs are becoming so attractive.

The pressure on farmers is unlikely to ease up anytime soon. The Eurozone crisis adds huge amounts of uncertainty as both livestock prices and CAP payments are very sensitive to the Sterling-Euro exchange rate. CAP reform will see income support payments reduced whilst also requiring farmers to be be "greener", meaning they will need to protect "habitat" and take land out of production further squeezing income. Furthermore farmers in Less Favoured Areas (LFAs; roughly half of Ynys Môn is classified as LFA) will no longer receive higher levels of support. The list goes on and on.

Accordingly, with all this going on and its controversial side-effects on our landscape, it is both ironic and inexplicable that the Welsh Government decided to do away with a Rural Affairs Minister at cabinet level and downgrade and split its rural affairs department.

For those interested, the relevant sections comparing upland and lowland farm incomes over the past twelve months are below. Farm Survey

Thursday, 22 December 2011

An ill wind blowing across Ynys Môn

Wind Turbine locations on Ynys Môn
(source: AAWT)

Considering that Ynys Môn has been promoting itself as an 'Energy Island' for a few years now (and will soon become an Welsh Government sponsored Energy Enterprise Zone), the council itself seems remarkably ill-prepared and lacking in direction when it comes to any forms of energy other than Nuclear.

For example, the proposed 25,000 tonne Anaerobic Digestion plant in Mona has been criticised as being far, far too large. With only 35,000 tonnes of appropriate biodegradable industrial and abattoir waste in the whole of North Wales, the plant would need to ship in source materials from as far away as Mid Wales according to Friends of the Earth (a body which normally supports AD plants!). The Welsh Government enshrined a 'Proximity Principle' in TAN21, which states that waste should be treated or disposed of as near to the source of origin as possible. What therefore is the logic of placing an AD plant of that size in Mona? Indeed, in what appears to be a tacit acceptance of this fact, the developer has since hired several hundred acres of land in Valley to grow silage to feed the plant when it is approved. Not only is this pushing up the price of silage on the Island for farmers who need it to feed livestock, the application was originally given planning approval on the grounds that it would divert waste from landfill; now we learn that he is going to have to grow a crop to feed it. Thats the equivalent of erecting a wind turbine and then placing a enormous electric fan opposite to blow air at it!

The Biomass Plant proposed on the Peboc site in Llangefni is a remarkably similar story. It will apparently burn up to 180,000 tonnes of "locally sourced" timber every year. Seen any huge forests around Ynys Môn lately? Me neither. Instead the developer will be shipping it from Scotland and, amazingly, Nova Scotia in Canada. What's green about that?

Considering where the source materials are coming from, neither of these plants seem to have any logical reason whatsoever to be located on Ynys Môn — other than because Anglesey is promoting itself as an Energy Island and is possibly being thought of as a soft touch by grant-seeking developers. Furthermore the benefits of having them here are also not entirely clear — especially when you consider how few local jobs they will produce. For example, the developer of the Peboc biomass plant claims it will create 250 temporary jobs and 150 permanent jobs. Curiously their own Transportation Assessment mentions that the plant will only require 25-30 staff... furthermore there is no analysis of what effect building a massive incinerator (because that's what a 'biomass plant' actually is) will have on present and future employment in Llangefni — let alone on the tourism industry. What will be the net effect on jobs?

Then we come to the recent proliferation of planning applications for Wind Turbines on the Island. Personally I am yet to be convinced of their effectiveness as a means of reducing carbon emissions — especially when they anyway require fossil-fuel plants running on permanent standby to produce energy when the wind doesn't blow.

More than any other 'energy' development on Ynys Môn, wind turbines have created the largest popular opposition movement in the shape of Anglesey Against Wind Turbines. Around 200 people attended a stormy Penmynnydd Community Council meeting last week to object to an application to build some 100m-tall wind turbines in the area. Significant numbers also attended a similar meeting of the Llanfair-Mathafarn-Eithaf community council this week when a similar application was discussed in Brynteg. CAP reform and the 'greening' agenda will see farmer's incomes squeezed so they legitimately need to diversify and find other revenue streams, but it is difficult to argue that 100m-tall turbines will not be a massive blot on the landscape, are hugely unwelcome to those who live near them, and could potentially effect the wider tourism industry.

The Council has now announced a public consultation into Supplementary Planning Guidelines governing Onshore Wind Energy applications — but it seems a little late in day considering there are currently already over 50 planning applications for turbines on the Island, each of them being considered independently of the rest. It seems to me that the Council needs a clear strategy for wind farms. Like Conwy, which only allows extremely tall turbines to be erected in one defined area and has imposed a fairly low height restriction on them elsewhere, Anglesey council needs to do some serious thinking rather than letting them proliferate throughout the island on an ad-hoc case-by-case basis.

So in my view, apart from the preparations for Wylfa B, the council has got itself into a real mess with its Energy Island 'strategy'. With the exception of the underwater turbines off the Skerries, the developments being proposed so far:

  • deliver no discernible green benefits considering the long distances the source materials need to travel
  • ultimately provide relatively few low-skilled, manual jobs without a proper assessment of the overall net effect on jobs
  • require the shipping into Anglesey of large amounts of unpleasant waste (the Peboc biomass plant alone estimates 78 daily deliveries of wood; 5 daily deliveries of tallow and vegetable oil, and 88 trips related to the shipping of pellets. Thats a helluva lot of HGVs everyday)
  • do not lead to Ynys Môn becoming a 'Centre of Excellence' in any of these technologies
  • potentially have a dubious effect on tourism and other businesses

So what is the point being an 'Energy Island' if we don't gain anything from it? Surely the vision behind the Energy Island strategy originally was to promote Anglesey as a Centre of Excellence in energy technology, not a dumping ground for dubious, grant-seeking, "dirty" developments. The same is true of wind turbines: they are not a new technology, the community as a whole does not benefit from them, and we can't compete with the Danes or Germans in the development and manufacturing of them as they already have the expertise, experience and economies of scale.

Ynys Môn needs to be looking to utilising its unique Island resources and promoting renewable technologies in their infancy — as with the Skerries underwater turbines. In other words we need some vison, better strategic long-term thinking, and higher aspirations.

UPDATE: You can now register your objection to the Peboc biomass plant here.

Thursday, 8 December 2011

Explosive Wind Turbines


On the day that a Scottish windturbine exploded in spectacular fashion in today's gales, a reader writes:

I attended the public meeting held last night by Penmynydd and Star Community Council. Between 150-200 people attended, some were unable to squeeze into the hall. The Community Council Chair did a good job as almost to a man (and certainly every woman and child) was opposed to the plans being discussed for an industrial size wind turbine development in the community.  
About half the people were from the community and they spoke with passion about their worries about the noise and flicker that are known to cause health problems; and about the loss of jobs that will result from the destruction of the landscape that is the main attraction for tourists and visitors; and their fear that high quality businesess will not be attracted to come to the island when they can't offer skilled staff a good quality of life; and the worry that homeowners will not be able to sell their houses as no one will want to come here to live in the shadow of the turbines. 
Despite the strength of public feeling and genuine concerns, the Councillors voted 3 to 2 in favour of building the first of what could be many turbines - a 71 meter high turbine that will be seen for miles around.

Update: One Ynys Môn County Councillor comes out completely against the approval of any further wind turbines on the Island:
No to Wind Turbines

Friday, 29 October 2010

Any port in a (funding) storm. (Updated)

I wrote back in March this year about the Offshore Wind Site Development Competition organised by the Department for Energy and Climate Change (DECC) to allocate £60m of funds to help port authorities and developers looking to develop new offshore wind manufacturing and assembly facilities. Ports which wished to apply had to prove that they:

  • have access to sufficient land that could be developed into wind turbine manufacturing facilities;
  • are suitable for the transport of large and heavy products;
  • and already have heavy duty surfacing capable of bearing heavy loads in place. 

There was much hope at the time that, in line with the Energy Island concept, Holyhead's now defunct Anglesey Aluminium plant, which has a deep water dock, would be a very suitable location.

Happily the £60m funds have survived the Comprehensive Spending Review and the competition is still open -- although it has now emerged that because this is classed as 'business support' (i.e. a devolved function) the lions share of the £60m will be reserved for England with only Barnett consequentials available to Wales, Scotland and Northern Island. The good news is this guarantees that the Welsh Assembly will receive £3.5m towards developing a Welsh port (and just by looking at the adjacent map, it can only really be Holyhead). The bad news however is that no matter how eligible or suitable Holyhead may appear, it cannot receive any more than that amount. This has cued outrage from Albert Owen, who has said this is "another example of the Tories and Liberals marginalising Wales", whereas Ieuan Wyn Jones, asserts the decision shows a "complete lack of respect" for the Welsh economy.

My personal view is that its highly unlikely that £3.5m alone will be anywhere near enough money to properly transform the Anglesey Aluminium plant and dock into one suitable for manufacturing and shipping offshore wind turbines. Accordingly it would have been far better for the government to take a more strategic view and divide the total budget between the two or three most suitable ports (no matter in which region they are located) so that the sums each location received would be sufficient enough to deliver a considerable impact.

However -- and here's a novel thought -- instead of forever whinging about supposed slights by the coalition government, why doesn't the Welsh Assembly Government step up and show us that it can take action when required? WAG has a £15bn budget; of that approximately £1.2bn is earmarked for Economic Development and Transport. As Ieuan Wyn Jones has announced that half the Economic Development budget will now be spent on as yet undefined infrastructure projects, why can't some £11.5m of this money (i.e. 9 percent) be added to the £3.5m from DECC to make a pot of £15m for developing Holyhead port? Presumably an investment of this kind could help make Holyhead the key staging area for 'Round 3' offshore wind farms in the Irish Sea -- whilst also supporting the development of a sustainable new industry in the UK's poorest area.

The Welsh Assembly has been only too happy to waste our money on expanding mostly unnecessary universal benefits (such as free prescriptions and free breakfasts for primary school children) which neither generate jobs nor possible future sustainable revenue streams for Wales. Its time for WAG to get its priorities in order, stop using the excuse that it is 'underfunded' (according to the Holtham Report, through the Barnett Formula Wales receives £112 for every £100 spend on devolved activities in England) and go out an earn the 'respect' it says it deserves.


UPDATE: I am grateful to commenters who point out that the Port of Mostyn near Holywell, with ready access to the A55, M62, M56, and M6, is already well ahead in establishing itself as the ideal servicing location for offshore wind farms in the East Irish Sea. This clearly shows that for Holyhead to compete, DECC/WAG support to modify the port will be meaningless unless it first manages to attract wind turbine manufacturers to set up production operations in the town. Just before the election there were a number of front page stories in the Daily Post about how the then Welsh Secretary, Peter Hain, was in talks with a unnamed company to set up just such a wind turbine factory on the Anglesey Aluminium site. Hain even described it as "the beginning of good times" for Anglesey -- though predictably, as sure as today's front pages become tomorrow fish'n'chips wrappers, we never heard anything about the whole thing ever again.

I think that the 'Energy Island' concept is a good one, and, in theory, Anglesey is ideally located to take advantage of a trend towards lower carbon energy sources, be they nuclear or renewable marine technologies. But as I have written previously:

"For the Energy Island concept to be a full success Anglesey must become an originator of energy technology -- not just a destination for off-island companies to place various schemes. Accordingly the council must work to incubate Anglesey-based energy start-ups. The only way to do this would be to work with local research centres, such as Bangor University, to develop some kind of Energy Science Park located somewhere on the Island. I would further suggest that using the "Shell Fund" to provide "seed money" for such start ups would be a far more productive use of the money then purely funnelling the majority of it into Oriel Môn each year."

Thursday, 23 September 2010

Quote of the Day (fission-safety-edition)

Commenter 'Jarlath' makes the case for Wylfa B and Nuclear power in general:

"Then there are the cries that [nuclear power is] not safe, with reference to accidents in the past, a bit like saying I wont fly today because a plane crashed in the sixties, or that I will not buy a car because an old Lada is so unsafe."

Thursday, 26 August 2010

Making a success of the Energy Island concept

Underwater turbines
There was some good news for Anglesey's Energy Island project earlier this week when developers unveiled a £70m project to generate electricity with seven underwater turbines between the Skerries and Carmel Head. The advantages of underwater turbines is that unlike wind turbines  they are constantly generating power due to the movement of tide, and that they have only a small visual footprint. A two day exhibition was held earlier this week at Holyhead Town Hall, and the project will apparently be submitted for offshore planning approval to the Welsh Assembly Government next month. If all goes well, commissioning could begin as early as 2013-14.

Personally I believe that the Energy Island concept to be exceptionally promising. It combines great ambition with an understanding of Anglesey's unique resources. I'm sure there are many councils up and down the country which would love to have a similarly coherent economic development strategy. However, I do also have some reservations:

  • Energy projects, whether they be nuclear, tidal or otherwise, can only be realised by very large firms. Accordingly the council's Economic Development unit, in its enthusiasm for grand schemes, must take exceptional care to not inadvertently neglect nurturing and promoting the Island's indigenous small businesses -- of all kinds, energy-related or not. Following the loss of Anglesey Aluminium, we know the ill effects of putting too many eggs into one basket.
  • For the Energy Island concept to be a full success Anglesey must become an originator of energy technology -- not just a destination for off-island companies to place various schemes (the marine turbines we discussed above are a good example of this as MCT's R&D centre is actually based in Bristol). Accordingly the council must work to incubate Anglesey-based energy start-ups. The only way to do this would be to work with local research centres, such as Bangor University, to develop some kind of Energy Science Park located, for example, next to Wylfa. I would further suggest that using the "Shell Fund" to provide "seed money" for such start ups would be a far more productive use of the money then purely funnelling the majority of it into Oriel Môn each year.
  • Finally the council must not approve all energy-related projects willy-nilly. The decision to site a biodigester in Bodffordd is a good example of the council falling over itself to be seen to furthering the Energy Island agenda without properly considering whether Bodffordd really was the most suitable location for that particular development.

Friday, 26 March 2010

Will GE really build a wind turbine factory on Anglesey?

  
The Daily Post breathlessly informs us today that "Anglesey is in the running to win a £100m wind turbine manufacturing plant that would create 1,900 new jobs" and that "urgent calls are being made by the Government to GE directors to persuade them that the the island is the 'ideal site'". This comes only a month after Peter Hain informed us that he was in talks with unnamed company (not GE) which also wants to convert the former Anglesey Aluminium smelter into a wind turbine factory.

What are we to make of all this? Its certainly true that GE yesterday announced their plans to invest £99m over the next decade on building a turbine manufacturing plant somewhere in the UK to take advantage of the Government's plans for 8,000 wind turbines by 2020 in giant offshore wind parks in the North Sea and Irish Sea. However, despite what the Daily Post informs us, even if GE chooses Holyhead, it will not create 1,900 new jobs in Anglesey. GE's figures make it clear that the plant itself will only employ around 500 people, with an additional 450 jobs created in other sites in the UK. GE also estimates that their investment will also support a further 950 positions at other UK companies which will supply the components - which is where the Daily Post finds the 1,900 figure. Still 500 jobs would be fantastic news for Anglesey after having lost around 3,000 over a very short period of time.

In terms of location GE have not yet decided where to build the plant but have made it clear that it will be dependent on the site they choose receiving some or all of the £60m funding announced in this week's budget to help develop British ports to support the offshore wind industry. Apparently this £60m fund will be allocated by the Department for Energy and Climate Change (DECC) as the core part of their Offshore Wind Site Development Competition. The DECC is inviting bids only from port authorities and developers proposing to develop new offshore wind manufacturing and assembly facilities, which:

  • have access to sufficient land that could be developed into wind turbine manufacturing facilities, 
  • are suitable for the transport of large and heavy products 
  • and already have heavy duty surfacing capable of bearing heavy loads in place. 

This all sounds good for the former Anglesey Aluminium plant in Holyhead which certainly fulfils all the above criteria. However it seems that Blyth in North East Eangland, which is already home to the National Renewable Energy Centre (Narec), is the favourite to win at least a large chunk of this funding especially as it has already secured a commitment from the company Clipper Windpower to locate its blade manufacturing facility there. Accordingly, if Anglesey is to be considered ahead of Blyth, Peter Hain needs to move very quickly indeed to secure a commitment from GE to choose the Anglesey site.

What does this new development tell us about the other unnamed company which was announced with huge fanfare in the Daily Post last month? Peter Hain even called it the "beginning of the good times" for Anglesey but is now apparently being "tight-lipped" about. Was it not quite the sure thing it was presented as last month when its announcement conveniently overshadowed the Welsh unemployment data which was also released on the same day (as the Druid blogged about here)?

So, as we have seen, for Anglesey to benefit from all of this we need a lot of planets to line-up perfectly: GE have to be persuaded to choose Holyhead, the DECC has to be persuaded to award a large chunk of the £60m to support the deal, and all this has to happen quickly before Blyth bags all the cash... Perhaps this is the time for Peter Hain to resurrect the £48m grant he originally offered Anglesey Aluminium last November to continue production?
 

Wednesday, 17 February 2010

Hain: People of Anglesey rejoice - the good times are back! (updated)



Politicians are never slow in claiming credit for good ideas. For example the Druid hears that certain Anglesey County Councillors are privately displeased with Albert Owen's hijacking and use of their 'Energy Island' concept to promote himself - despite having had no hand in its creation.

Today's Daily Post brings another such example. Ahead of Peter Hain's visit to Anglesey today, he has briefed the paper that an unnamed company is very interested in converting the Anglesey Aluminium premises into a wind turbine factory in order to produce the thousands of units required by the huge offshore wind farms the government wants to build. Apparently the deep port at Anglesey Aluminium could be ideal for such a plant to allow easy transportation of the turbines out to sea where they would be used.

According to Hain:

“There is a very good prospect of hundreds of jobs being created.
“Anglesey Aluminium’s closure has been a body blow to the local economy but we have been working to get new, high quality jobs to the area.
“They are eligible for some government assistance and convergence funding. It is a very serious and viable project and I think it could be the beginning of good times, especially with the likelihood of a Wylfa B.”
"The beginning of the good times"? What does that say about how good for Anglesey the previous 13 years of Labour rule have been?

Of course this could be fantastic news for Anglesey which is still reeling from approx. 3,000 job losses over a relatively short period of time. However the Druid thought it was strange that the company in question could not be named apparently because "talks are commercially sensitive". Really? More likely because the company in question doesn't want to be used as an electoral political football by opportunistic politicians thought the Druid. And sure enough a few hours later the BBC's Betsan Powys popped up to blog that she had met with the individual behind the plan and confirmed that he thought it had become "political fodder" and that Hain is basically indeed taking credit for a great deal of work done by him and others. Surprise surprise.

Considering how during one of the worst recessions since the 1920s the Welsh Assembly Government has managed to spend less than a quarter of its business support budget six months into the financial year, politicians would be better off doing more and spinning less.

UPDATE: When the Druid wrote the above he had only read the online version of the Daily Post story. Now he has seen the actual paper version and it is even more sickening:


"My" wind power plan? "Hain bid" to turn ex-smelter in to turbine factory? Anybody would think that Peter Hain actually had something to do with the plan, rather than just grabbing credit for the hard work of others. Well done to Betsan Powys for revealing the real story - and shame on The Daily Post for being so craven.

UPDATE 2: The following comment by 'forlonehope' on Betsan's blog is worth reproducing in full here:

To build the towers you need large scale steel fabrication, a bit like a shipyard. To build the blades you need large scale composite fabrication, a bit like an aircraft factory. To build the generator you need gearbox and heavy electrical engineering works. To cast the hub you need a precision iron foundry. None of that looks like a redundant aluminium smelter or, for that matter, the kind of skills required to operate it. What it does look like is another bit of electioneering. It's particularly cruel as it will build up hopes only to dash them.